|
Nuclear
|
Efficiency
|
|
 |
HiTemp HydraNuts used to cut reactor closure time. All HiTemp Nuts are operated simultaneously, reducing the time required by hours when compared to a three tensioner system. |
|
Even gasket compression
|
|
 |
Reactor Coolant Pump gasket compressed evenly and accurately in minimal time frame. |
|
Compact design
|
|
 |
Two stage HiTemp HydraNuts allow generation of high bolt loads on 7” reactor bolts.
Twin inlet harness ensures fast operation. |
|
|
|
|
|